Monday, 6 June 2011

Coffee Cup - Risk assesment

Production: The Coffee Cup

Assessor(s): Ellie Raymond
Date: 10th May
Location: Plymouth Ski Slope

Signature(s): ERaymond
Date for Review: November 2011


Activity/Element
Hazard
Who is at Risk?
Existing Controls
Risk Rating
Additional Controls Required
L1
C2
R3

Cameras set up.


Filming outside – Possible rain.




Driving outside.



Filming outside.





Filming near roads.

 Could trip on wires.

Equipment could get damaged, electric shocks.

Possible slippery roads.

If hot, people can become dehydrated quickly.

General Public, through traffic.

 Cast and Crew


 Cast and Crew




Mainly cast, some crew




Cast and Crew




Cast and Crew
 Camera plan, wires taped down with bright tape.

Covers for all equipment and dried off immediately if things get wet.


Drive slowly, pay attention to road conditions.



Ensure adequate breaks are taken to allow everyone to have a drink.


Set up limits for possible crowds and stay away from the side of busy roads.

3


2



   
    2



  

    3



   

   2

   1


   3



  
   4



  

   2



  

 2/3

3


6




8



  

    5



 

 4/6

 None



 Requires a written safe system of work


 Requires a written safe system of work




 None





 Requires a written safe system of work

1Likelihood of Occurrence (L)
1. Improbable: probability is close to zero
2. Remote: Unlikely though conceivable
3. Occasional: Could occur some time
4. Probable: Occurs repeatedly/an event to be expected
5. Frequent: Not surprised if event occurs/will occur several times
2Likely Consequences (C)
1. Negligible: Trivial injury (requiring minor first aid)
2. Minor: Minor injury/short term absence
3. Serious: Single severe injury and/or multiple minor injuries
4. Critical: Single fatality and/or multiple severe injuries
5. Catastrophic: Multiple fatalities
3Risk Rating L x C = R
1-5     Tolerable: No additional controls required
6-10   Low Risk: Probably requiring a written Safe System of  Work
11-15  Medium Risk: Written SSW required until risk is designed out
16-20  High Risk: Consider Permit to Work
21-25  Intolerable Risk: Cease activity